A key facility at the international terminal is the Central Services Building (CSB) which houses a number of crucial building services including 3 diesel generators which are served by 5 existing 55,000 litre underground fuel tanks and associated pipework, filters and pumps. Vaughan Civil’s works includes the replacement of the old UST infrastructure with Above… Continue reading Sydney Airport CSB Fuel Tank Replacement Works
The Lighting Equipment Room (LER) & Underground Storage Tanks (UST) Replacement project at Sydney Airport (SYD) consists of the replacement of 3 airside underground storage tanks with new above-ground tanks. SYD has 6 LERs located at the ends of each runway which supply power to the Aeronautic Ground Lighting electrical network. Each room has a… Continue reading Sydney Airport LER & UST Replacement
As part of ESRs development of Australia’s largest rooftop solar installation at Moorebank Intermodal Precinct, they require a precinct wide microgrid, which will operate at a combination of 11kV and 33kV to provide the required electrical capacity to park tenants. Vaughan Civil is currently delivering the Design & Construction of a substation consisting of two… Continue reading ESR D&C Substation and Feeders
The relocation of 11kV electrical utility assets (powerlines) from overhead to underground along Byamee Lane to Ten Mile Lane (2.8km). The scopes of work included: Removal, replacement and installation of new poles. Supply and install of new underground to overhead poles (UGOHs). Construction of a new 11kV switch station and transition of 11kV conductors to… Continue reading Byanmee Lane Electrical Relocation
The Moorebank Import/Export (IMEX) terminal is centrally located just 30km west of Sydney’s CBD and Port Botany at the Moorebank Intermodal Precinct. The terminal offers direct and daily connections into Port Botany on dedicated freight-only rail and is estimated to transport up to 1 million TEU Containers per annum. Vaughan Civil successfully delivered additional heavy-duty… Continue reading Qube IMEX Container Beams & Intermodal Freight Hub
As part of the major M1 Pacific Motorway Extension to Raymond Terrace, one of the country’s busiest transport corridors, this project is based on the Design and Construction (D&C) of 10km of a new 4 lane divided road. Vaughan Civil has been engaged to construct and adjust multiple existing utilities to enable the main road… Continue reading M1 Pacific Motorway Extension – Water Relocation Works
As part of the $11 million sewage upgrade in the Cockle Bay area which included the installation of 33km of pipelines and a sewage pumping station, Vaughan Civil was engaged by Central Coast Council for the Design and Construction of a new pump station and supporting pipelines. Scope of works included: Construction of a 3m… Continue reading Cockle Bay Towns Sewerage Scheme & Pump Station
As part of the Beaudesert Water Supply Augmentation Program, improvements are being made to the Beaudesert Water Treatment Plant, including the construction of 2 new storage reservoirs. Vaughan Civil was engaged for the construction a new water booster pump station and installation of new pressure reducing valves (PRVs). Scope of works included: Construction of a… Continue reading Booster Pump Station and PRVs Installation
Figtree Hill is a new master planned community under development at Campbelltown in Sydney’s south-west. Vaughan Civil is currently constructing a new sewer pump station which will serve the future community.
Vaughan Civil was integral in the delivery of the project by expediting sections of works and maximising resources on site to meet the critical timeline of the project.