This project involved the modification of water network infrastructure within the Gallipoli Barracks, comprised of installing a Backflow Prevention Device to the main water inlet, demolishing redundant hydrants on the legacy water network and installing new hydrants on the ELF-2B (Enhanced Land Force) Fire network, and connecting legacy potable water connections onto the ELF-2B potable water network.