Upgrade of the buried electrical, sewerage and fire water reticulation (including potable and hydrant) lines which consisted of the installation of 350m conduits and cable with 7 pits, 2 x new Distribution Pillars, 370m HDPE OD125 fire ring main with booster and hydrants, 370m copper Potable Water with meter at mains and removal and disposal of existing services after commissioning.