Ausgrid’s CONSAC Replacement Project has set out to progressively replace the existing underground low voltage electricity cables in the Sydney area. These cables are reaching the end of their serviceable life and are being replaced to allow Ausgrid to maintain a safe and reliable electricity network. Vaughan Civil were awarded the Design and Construct contract… Continue reading Illawong & Menai CONSAC Replacement Project D&C
The Aerotropolis 132kV Feeder Stage 3B serves as a critical infrastructure project to fuel the Western Sydney’s long-term expansion and energy needs.
The Moorebank Interstate Terminal Development and Rail Access project is a nationally significant infrastructure development that will transform the way containerised freight moves through Sydney and along the east coast.
Vaughan Civil are currently engaged as the primary contractor for the Liverpool CBD Sewer upgrade. Working on the construction of DN1200 pipes and manholes throughout the Liverpool CBD. Our scope is includes: 250m trenching for 300mm, 225mm and 150mm PVC Sewer Pipe 250m of Under boring of 457OD Steel Casing for 300mm PVC Sewer… Continue reading Liverpool CBD Sewer Upgrade
Vaughan Civil were awarded the principal contract for the Prospect to MacArthur (ProMac) works. ProMac will help Sydney Water deliver on its vision of creating a better life with world-class water services.
As part of the Prospect to Macarthur (ProMac) project, Vaughan Civil carried out the construction a new water pumping station in Harrington Park, to provide drinking water services for 84,000 new homes in the Southwest Growth Area and Western Sydney Aerotropolis Growth Area. This pump station helped bolster the water transfer link from Prospect South… Continue reading Harrington Park Pump Station
Vaughan Civil were awarded the CMW Tunneling package (electrical scope). The Sydney Metro West Project – Central Tunneling Package comprises twin 6m diameter TBM tunnels running approximately 11km from the launch shaft at The Bays to the retrieval shaft at Sydney Olympic Park.
As part of the primary scope for the Warringah Freeway Upgrade project, SPA awarded Vaughan Civil the contract to complete all ASP Level 1 & 2 works for the various Ausgrid Asset Relocations required to allow for the RMS road alignment and widening works.
As the principal contractor for the electrical packages awarded by Ausgrid for the Warringah Freeway Upgrade (WFU), Vaughan Civil were responsible for the relocation of various telecommunication assets, excavation and backfilling of all trenches for the installation of conduits for: Telstra, Optus, TPG and NBN (within Telstra).
The Rozelle Interchange Works, Stage 3B (RIC-3B) is a major component of Australia’s largest ever infrastructure project.