A new major water pump station which supplies to Redbank Plains, the Ripley Valley, the Swanbank industrial area and beverage giant Frucor Suntory’s new manufacturing facility in Redbank Plains, QLD, which was completed in 2024.
Scope of works:
Construction of Booster Pump Station including all architectural finishes, structural and civil works
Supply, fabrication, and installation of pipe supports and structural steel
Supply and installation of the flow meter pit and associated pit pipework
Supply, fabrication, and installation of the flow meter pit access ladders
Cut and fill operations including bulk earthworks, importing suitable fill material, material removal as required and soil compaction
Survey detail following bulk excavations, cut / fill and compaction operations
Excavation in preparation of concrete slabs, pad footings, trenching / excavation in preparation for pipe laying and thrust block installation