Ausgrid’s CONSAC Replacement Project has set out to progressively replace the existing underground low voltage electricity cables in the Sydney area. These cables are reaching the end of their serviceable life and are being replaced to allow Ausgrid to maintain a safe and reliable electricity network.
Vaughan Civil were awarded the Design and Construct contract for the Illawong & Menia replacement phase where the scope of works included: