Vaughan Civil are carrying out upgrade works to the existing Beenleigh Wastewater Treatment Plant (WWTP) to boost capacity to the local network, enhance environmental performance, and reduce operational costs. The project will see a brand-new wastewater pump station, 2km pipeline, integrated shutdowns within the existing plant during commissioning and associated infrastructure required to smoothly transition flows to the Loganholme WWTP.
Scope of work includes: